Oil Reconditioning Project

A critical project to recondition the control fluid (two tanks of capacity 16 KL each) for the India’s largest energy conglomerate and coal-based power producer with capacity of 4760 MW.

Read More

Case Studies

Case Shot 1: How a 1200 MW Power Plant Saved ₹3.01 Crore by Resolving EH Oil Contamination Issues

A power plant in Western India using Chinese technology turbine EHC system saved 3.01 Cr approx. with MLC LVDH TRIX-20 EH Oil Filtration


Case Shot 2: How Minimac Systems Saved ₹1.5 Crore for a Power Plant with EH Oil Filtration System

A power plant in Northern India using Indo- Japanese technology turbine EHC system saved 1.5 Cr approx. with MLC LVDH TRIX-20 EH Oil Filtration


Case Shot 3: EH Oil Reconditioning: How Minimac Systems Saved ₹5.6 Cr for a 1320 MW Power Plant

A 1,320 MW (2 x 660 MW), one of the first and largest supercritical coal-fired power plants using Indo-Chinese Turbine EHC System in Northern India.


Case Shot 4: Enhancing Turbine Reliability and Reducing TAN Values with Advanced EH Oil Reconditioning System

A 1200 MW coal-fired thermal power plant using Indo-Chinese Turbine EHC System in Southern India.


Case Shot 5: Minimac Systems Prevented a ₹5 Crore Loss for a 1200 MW Coal-Fired Thermal Power Plant

A 1200 MW coal-fired thermal power plant using Indo-Chinese Turbine EHC System in Southern India.


Case Shot 6: Lube Oil Reclamation: Achieving NAS 3 from NAS 12 for India's First Indigenous Aircraft Carrier

Critical project successfully executed for ISO 9001 Certified - Millenium's shipbuilding yard under the Ministry of Ports, Shipping, and Waterways (Defence Sector).


Case Shot 7: Reduction of the TAN value of the control fluid from 0.23 to 0.08 mgKOH/gm

Team Minimac successfully executed a critical project to re-condition the control fluid (tank capacity 16 KL) for a 2*600 MW coal-based thermal power plant in Chhattisgarh.


Case Shot 8: Saved the plant from a major breakdown

The Minimac team successfully completed a critical flushing project in a Big Fertilizer company with a capacity of 4000 tonnes in Jharkhand.


Case Shot 9: Oil Reconditioning project for the India’s largest coal-based power producer

Team Minimac successfully executed a critical project to recondition the control fluid (two tanks of capacity 16 KL each) for the India’s largest energy conglomerate and coal-based power producer with capacity of 4760 MW.


Case Shot 10: Oil Reclamation project for the largest oil refinery in WB, India

A critical oil reclamation project for the largest oil refinery with a capacity of 8 million tonnes per year in West Bengal, India


Case Shot 11: Efficiently Eliminating Varnish from 23,500 Liters of Oil in Just 516 Hours

Mitigating a Potential Power Crisis in Western India through Varnish and Solid Contamination Removal


Case Shot 12: Effectively reducing the TAN Levels of 32kl of FRF Oil

Abating TAN Levels: Minimac's Tailored Solution for Critical Oil Values at India's 9th Largest Coal-Fired Power Plant


Case Shot 13: Preserving 35 kL of Prime 46 Oil from Solid and Moisture Impurities

Minimac Rescues Bihar Power Station : Customized Solution for Solid Contamination and Moisture Wins


Case Shot 14: Plant Renovation Unveils Critical Role of Hydraulic Flushing in New Compressor Setup- Minimac in Action

Implementation of Hydraulic Oil Flushing Mitigates Compressor Failures Effectively


Case Shot 15: Power Plant Case Study - Uttar Pradesh

Minimac’s Oil Purification System Saves INR 10 CR in Downtime Costs at a 3000 MW Power Plant


Case Shot 16: Case Study - Madhya Pradesh

Minimac Systems Restores Oil Purity at Key Power Facility in Madhya Pradesh, Preventing Costly Downtime


Case Shot 17: Case Study - Indian Navy

Minimac Systems Ensures Optimal Lubrication for India’s Largest Indigenous Aircraft Carrier


Case Shot 18: NTPC Chhattisgarh Case Study

Preventing Catastrophic Shutdown at Chhattisgarh 2980 MW Thermal Power Plant


Case Shot 19: FRF Reconditioning case study

Minimac Systems Restores Oil Purity at Uttar Pradesh, Preventing Shutdowns Worth INR 10+ Crores.


Case Shot 20: Oil and Gas ( Case study )

How Minimac Systems Enhanced Oil Purity in the Oil & Gas Sector.


Case Shot 21: MW power plant Case Study West Bengal.

How Minimac Systems Successfully Saved ₹10 Crore with Proactive Oil Purification & Reliability Enhancement.


Case Shot 22: Chhattisgarh FGD Flushing Project Case Study

Minimac Systems Lowers NAS from 12 to 5 at Chhattisgarh FGD Unit.


Case Shot 23: ROGC complex Case Study

How Minimac Systems Restored Stability at the World’s Largest Refinery.